INETEC won the contract for Periodic Material Inspection of Reactor Pressure Vessel of Units 1-4 during the Period 2011-2014, at Paks NPP.
INETEC won the contract for Periodic Material Inspection of Reactor Pressure Vessel of Units 1-4 during the Period 2011-2014, at Paks NPP.