BALANCE OF PLANT INSPECTION

  • INETEC provides BoP inspection for PWR, VVER, CANDU
  • inspection of BoP includes:
    • eddy current inspection of heat exchanger tubes using PRO BOBBIN
    • eddy current inspection of heat exchanger tubes using PRO ROTATE for detailed defect characterization
    • visual testing inspection of heat exchanger tubes
    • ultrasound inspection of heat exchanger tubes
    • RFT inspection of heat exchanger tubes
    • RT inspection of heat exchanger tubes
    • magnetic testing inspection of heat exchanger tubes
    • penetrant testing inspection of heat exchanger tubes
    • structural integrity assessment for heat exchangers

Almost 35 years of technological excellence

We have gained international acclaim for developing technologies for nuclear power plant examination and repair, inspection and repair services, as well as various engineering studies that we conduct as our regular scope of activities.

  • 0+ client services
  • 0% export services
  • 0% represented worldwide