RPV-ISI, RPVH-ISI and ISI Services at Nuclear Power Plant Krsko

Published: 04.10.2010.

INETEC successfully performed reactor pressure vessel head in-service inspection, reactor pressure vessel in-service inspection and in-service inspection services during the outage 2010 at Krsko NPP.

Almost 35 years of technological excellence

We have gained international acclaim for developing technologies for nuclear power plant examination and repair, inspection and repair services, as well as various engineering studies that we conduct as our regular scope of activities.

  • 0+ client services
  • 0% export services
  • 0% represented worldwide