-
designed to ensure tube integrity
-
tube integrity is assessed after each steam generator inspection
-
consists of three elements:
- degradation assessment
- condition monitoring
-
operational assessment
-
evaluates all degradation mechanisms known to exist in the steam generator being
-
INETEC provides steam generator integrity assessment for PWR and VVER nuclear power plants
-
PWR steam generator integrity assessment is performed according to NEI directives
-
based on long-term experience, knowledge and extensive research, INETEC has established the VVER steam generator integrity assessment