PEOPLE

Our profound engagement is not only directed
to empowering human resources but also
to ensuring creativity freedom.

RPV and CRD PP ISI at Loviisa Power Plant

INETEC successfully performed in-service inspection of reactor pressure vessel and control rod drive protection pipe welds on Loviisa Unit 2 in Outage 2010 according to Loviisa NPP input documents and by the use of previously qualified inspection methodology approved by Finnish Radiation and Nuclear Safety Authority STUK.